Client Name
DPOB
Industry
Storage
Location
Coolum Beach QLD 4573
Duration (Project Length)
5 weeks
Completion Date
08/21/2024
Products / Services Used
- Mezzanine Floor
- Shelving
What was the problem / challenge we were solving in this project?
The client needed to move the additional business into this location, and we needed to design a Mezzanine floor and shelving storage that would both accommodate their current work process at ground floor level and be large enough to supply and install enough shelving to accommodate the incoming products.
What was the solution?
Design the correct mezzanine and shelving solution.
What were the results?
The results were a great client solution that fitted well within the time frame and a very happy customer.