Client Name
Louis Reos
Industry
Workshop
Location
Gold Coast QLD
Duration (Project Length)
6 weeks
Completion Date
09/05/2024
Products / Services Used
What was the problem / challenge we were solving in this project?
The client was out of room in his workshop, and he needed to get a lot of items up of the floor to make more use of the workshop area.
What was the solution?
We designed a mezzanine floor, that allowed for his workshop flow below to operate without columns in the way.
What were the results?
We designed, manufactured and installed a great mezzanine floor for Louis, and he is in love with it.