Client Name

Louis Reos

Industry

Workshop

Location

Gold Coast QLD

Duration (Project Length)

6 weeks

Completion Date

09/05/2024

Products / Services Used

What was the problem / challenge we were solving in this project?

The client was out of room in his workshop, and he needed to get a lot of items up of the floor to make more use of the workshop area.

What was the solution?

We designed a mezzanine floor, that allowed for his workshop flow below to operate without columns in the way.

What were the results?

We designed, manufactured and installed a great mezzanine floor for Louis, and he is in love with it.