morisset-project-completed

Austek Play, Morisset NSW

morisset-project-completed
morisset-project-illustration
morisset-project-illustration

Client Name

Austek Play

Industry

Commercial playground and outdoor fitness

Location

Morisset NSW 2264

Duration (Project Length)

6 weeks

Completion Date

01/15/2024

Products / Services Used

What was the problem / challenge we were solving in this project?

The customer was running out of space and needed more room to store their long-term stock. They had an existing mezzanine office and wanted to utilize the empty space next to it.

What was the solution?

AWS provided a 30m2 mezzanine in the empty warehouse space and used the existing mezzanine staircase as access. The mezzanine was equipped with a perimeter handrail and an access gate.

What were the results?

The customer achieved extra storage space and allowed them to clear up the ground floor work areas allowing them to work more efficiently.

modern-frameless-glass-mezzanine

Modern Frameless Glass, Taren Point NSW

modern-frameless-glass-mezzanine-image
modern-frameless-glass-mezzanine
modern-frameless-glass-mezzanine
modern-frameless-glass-mezzanine

Client Name

Modern Frameless Glass

Industry

Glass balustrade

Location

Taren Point NSW

Duration (Project Length)

6 weeks

Completion Date

09/18/2024

Products / Services Used

What was the problem / challenge we were solving in this project?

More storage – Faced with not only limited floor area, the mezzanine floor was limited by the roof height, which posed challenges in designing the floor with enough head clearance below and above the floor. In addition, there was minimal room to allow loading onto the mezzanine floor.

What was the solution?

A custom designed and built Mezzanine – AWS was able to maximise the above and below clearance by optimising the design and minimising the floor thickness. We opted for a swing gate instead of a sliding gate to meet the customers needs.

What were the results?

The customer was extremely happy with the result, and the installation team.

the-marshmallow-co-mezz-floor

The Marshmallow Co, Wyong NSW

the-marshmallow-co-mezz-floor
the-marshmallow-co-mezz-floor
the-marshmallow-co-mezz-floor

Client Name

The Marshmallow Co

Industry

Storage

Location

Wyong NSW

Duration (Project Length)

6 weeks

Completion Date

10/13/2023

Products / Services Used

What was the problem / challenge we were solving in this project?

Our client’s business was rapidly expanding, and they were quickly realising the needed more space. The needed to expand their business to create the room to package and store their orders.

What was the solution?

In order to increase the floor area of their existing unit, we worked closely with our clients to engineer a solution that would maximise their existing ground floor area while adding much needed mezzanine area above. AWS was able to structurally engineer a solution that would free span the area, negating the need for columns within the ground floor area. Safety was important for our client, so we opted to incorporate our up and over safety gate to ensure safe loading of stock to the mezzanine floor.

What were the results?

The mezzanine successfully enabled our customer to react to their rapid expansion, providing them with more floor area in a compact timeframe.

gold-coast-workshop-project

Louis Reos, Gold Coast QLD

gold-coast-workshop-project
gold-coast-workshop-project-image-mezzanine-stairs
gold-coast-workshop-project-image

Client Name

Louis Reos

Industry

Workshop

Location

Gold Coast QLD

Duration (Project Length)

6 weeks

Completion Date

09/05/2024

Products / Services Used

What was the problem / challenge we were solving in this project?

The client was out of room in his workshop, and he needed to get a lot of items up of the floor to make more use of the workshop area.

What was the solution?

We designed a mezzanine floor, that allowed for his workshop flow below to operate without columns in the way.

What were the results?

We designed, manufactured and installed a great mezzanine floor for Louis, and he is in love with it.

DPOB-mezzanine-floor

DPOB, Coolum Beach QLD

DPOB-shelving
DPOB-shelving
DPOB-mezzanine-stair
DPOB-mezzanine-floor

Client Name

DPOB

Industry

Storage

Location

Coolum Beach QLD 4573

Duration (Project Length)

5 weeks

Completion Date

08/21/2024

Products / Services Used

What was the problem / challenge we were solving in this project?

The client needed to move the additional business into this location, and we needed to design a Mezzanine floor and shelving storage that would both accommodate their current work process at ground floor level and be large enough to supply and install enough shelving to accommodate the incoming products.

What was the solution?

Design the correct mezzanine and shelving solution.

What were the results?

The results were a great client solution that fitted well within the time frame and a very happy customer.

Mezzanine Floor storage

ConnectAbility Mezzanine Floor

Project Description

Client: ConnectAbility
Location:   Newcastle, NSW
Project: Structural Raised Storage Floor with Office fitout

We were able to quickly install a structural steel mezzanine for ConnectAbility in Newcastle. The floor went on to be fitted out with offices.

Mezzanine wooden floor

Huge Mezzanine Floor Completed In Wetherill Park

Mezzanine wooden floor

With an installation time of just 1 week, we completed this 418 m2 floor in Wetherill Park, including two staircases and a safety handrail along the front, complete with sliding pallet access gates to the client’s deadline.

This floor doubles the storage space as racking can also be installed under it. Pallet racking will be installed on the floor, holding products to be picked by employers and ready for dispatch. The area of this floor is 418m2, doubling the area of the section of the warehouse to 836m2!

This structural floor is designed to hold 500 Kg/m2, providing plenty of storage space for the customer. All our floors are custom-designed, so your floor can be engineered for 350 – 500 Kg/m2 or more, depending on your needs!

Benefits of this floor

This floor has a range of benefits to the customer, including:

  • Doubling storage area.
  • Pallet access gates create easy access on the floor.
  • Two staircases for access and meeting fire regulations.
  • Affordable and much cheaper than moving location.
  • Freestanding means it is possible to be moved or sold in the future!
Mezzanine Floor storage

Waterlogic Structural Floor

Mezzanine Floor storage

Project Description

Client: Waterlogic
Location:   Marrickville NSW 2204
Project: Structural raised storage floor

Waterlogic in Marrickville, Sydney was quickly able to expand their storage space in their current warehouse premises with our structural raised storage area. The floor includes a new set of staircases, handrail, and a pallet access gate allowing them to move stock to and from the floor.

Customer testimonial

We commissioned AWS to replace our mezzanine at our Marrickville warehouse.

We found the service and quality of work to be outstanding and AWS were the most competitive bidder for the project when tendered.